  1. The fourth feeding round begins

    Top-dressing was starting while manual weed clearing continued.

    Farm note · Ongoing
  2. Wet ground brings back hand-weeding

    The rotavator had to wait, so we concentrated on clearing around each banana plant by hand.

    Farm note · Ongoing
  3. The next feed, and a week’s delay

    We postponed the calcium, magnesium and sulphur work while preparing the next base feeding.

    Farm note · Planned
  4. Preparing the next banana feeding

    Magnesium deficiency prompted a plan for additional nutrients and a different application sequence.

    Farm note · Planned
  5. Foliar spray work complete

    The banana foliar spray work was finished by the 27 October update.

    Farm note · Completed
  6. Caterpillar-control spray added to active foliar cycle

    More caterpillars were reported on the banana plants.

    Farm note · Mixed progress
  7. New 19:19:19 foliar application started

    A new 19:19:19 foliar round began.

    Farm note · Ongoing
  8. Second top-dressing and earthing-up complete

    The second banana top-dressing round and earthing-up were both reported complete.

    Farm note · Mixed progress
  9. Second top-dressing continues

    The second soil top-dressing round was still in progress.

    Farm note · Ongoing
  10. The second feeding round begins—and the product name is corrected

    The second soil top-dressing round began in the banana planting area.

    Farm note · Ongoing
  11. Earthing-up, rotavator and second feeding remain active

    The task list called for finishing earthing-up, completing the current rotavator work, then beginning a further pass across the plantation, and carrying out the second top-dressing round.

    Farm note · Planned
  12. Second foliar spray and earthing-up ongoing

    The second foliar round and earthing-up were ongoing.

    Farm note · Mixed progress
  13. Smaller plants remain active despite height lag

    About 5% of plants (roughly 600) were around 20 cm tall, with 6–7 small but active leaves and fresh leaf growth.

    Farm note · Partly complete
  14. Next foliar spray planned for 4 October

    A further NPK and Bavistin spray was planned for 4 October.

    Farm note · Planned
  15. Foliar cycle complete; new growth improving

    The current foliar application cycle was reported complete.

    Farm note · Mixed progress
  16. Plantation spray completed; soil work continues

    The plantation-wide 12:61:0 and chlorpyrifos spray was reported complete.

    Farm note · Mixed progress
  17. Plantation-wide spray began

    A plantation-wide 12:61:0 and chlorpyrifos spray began after insect activity had been reported on a few young banana plants.

    Farm note · Ongoing
  18. Rain replaced the planned irrigation

    Recent rainfall made irrigation unnecessary after the first top-dressing.

    Farm note · Mixed progress
  19. First soil top-dressing completed

    The first plantation-wide top-dressing cycle was reported complete.

    Farm note · Completed
  20. First soil top-dressing began

    A urea, phosphate and potash mix was applied around plants, with smaller plants assessed separately.

    Farm note · Ongoing
  21. Foliar feeding and weeding in progress

    A further 19:19:19 foliar round and manual weed removal were each reported about 80% complete.

    Farm note · Mixed progress
  22. Wet soil delayed top-dressing

    The ground remained saturated, so soil fertiliser was deferred.

    Farm note · Mixed progress
  23. Another 12:61:0 round partly complete

    The follow-up foliar round had started on 27 August; about 40% of the planting still remained at month end.

    Farm note · Partly complete
  24. First weed and 19:19:19 cycles complete

    Manual weeding and the first 19:19:19 foliar cycle were reported complete.

    Farm note · Completed
  25. Rainwater and weeds remained active issues

    Repeated rainfall left water standing around banana for about a week.

    Farm note · Observation
  26. Targeted weed control under way

    Spraying focused on the heaviest weed areas, while manual weed removal around banana plants continued.

    Farm note · Ongoing
  27. Plant survival checked

    The planted tissue-culture crop had been checked for losses and failed plants were replaced.

    Farm note · Observation
  28. Rain paused irrigation; weeds increased

    Rain supplied enough moisture to pause irrigation, while rapid weed growth became the next immediate concern.

    Farm note · Observation
  29. Second 12:61:0 round completed

    A second foliar feeding round was reported complete after new leaves had developed.

    Farm note · Completed
  30. First irrigation and foliar round completed

    The initial irrigation cycle and first 12:61:0 foliar spray were reported complete.

    Farm note · Completed
  31. Drenching complete; new leaves emerging

    Post-planting termite and fungicide drenching was complete.

    Farm note · Completed
  32. Tissue-culture planting completed

    The main banana planting was complete after a week of phased work.

    Farm note · Completed
  33. Banana planting began

    Tissue-culture planting began after land preparation; wet patches required manual bed work during establishment.

    Farm note · Ongoing
  34. Banana land levelling completed

    The banana area was levelled ahead of marking, planting and irrigation setup.

    Farm note · Completed
  35. Land preparation began

    Levelling began as part of preparation for the banana crop.

    Farm note · Ongoing